(613) 822-3040 info@allianceme.ca

Élisabeth Bruyère Hospital

Project Type: Mechanical Construction

About This Project

The Élisabeth Bruyère Hospital is the city’s oldest hospital and was the original Ottawa General Hospital. It’s one of three sites operated by Bruyère, an academic healthcare organization, and is the country’s largest academic palliative care unit.

Alliance worked with Trane to replace an air-cooled chiller at the facility. The machine helps cool water (or water-glycol mixture) and operates based on vapour compression, condensation, and evaporation. By absorbing heat from process water and then transferring this heat, the air-cooled chiller is used to provide consistent temperature and pressure.

Download our case study in PDF format here.

We’ve Been Building For Over 15 Years!

We have a wealth of experience across the commercial, institutional and high-rise residential sectors and have completed projects that range from $10K to $10M. We go beyond successful project delivery because we understand it's about delivering a vision and creating a legacy.

9

Design & Build

Integrated design and construction services in-house

9

Pricing

Guaranteed budgets based on conceptual projects

9

Incentives

Applicable energy reduction incentive programs

9

Project Management

Fast-track project schedules that overlap design and construction activities

9

Design Choices

Multiple concept options and project feasibility, offering the best solution for your project

9

LEED Accredited

Building design and construction sustainability by accredited professionals

1646 Woodward Dr
Ottawa, ON K2C 3R8

Mon - Thurs: 7am - 4pm
Fri: 7am - 12pm (noon)
Sat - Sun: closed

(613) 822-3040

ECRA/ESA# 7011655
RBQ# 5700-8450
TSSA# 000177194